Asad Jawed
I run operations the way an engineer builds a movement. Every part earns its place.
Exploded view
Take it apart. Find what slips. Put it back better.
That is how I treat a production line, a lab workflow or a whole company.
The method
Mechanical movement
Self-winding. Chicago time, with Karachi on the green hand.
Saved every year by process changes I led at Entegris
More capacity with no new equipment
Faster requisition intake with AI document reading
From design engineer to chief operating officer
I make operations run
like well-built machines.
I started out designing parts and tuning machines, went on to lead engineering teams in semiconductor materials, and now run a clinical laboratory. The method has not changed. I take the operation apart, measure what matters, and rebuild it so people make the judgment calls and software does the rest.
- Role
- Chief Operating Officer, SMS Medical
- Based
- Chicago area, Illinois
- Trained as
- Mechanical and industrial engineer
- Has led
- Production and product development engineering at Entegris
- Builds with
- AI agents, n8n, Python, CNC, machine vision
- Off the clock
- Cooking, gardening, cricket
Take it apart
Walk the process end to end and map every handoff. Most problems live between two steps, not inside one.
Measure it
Put a number on each step before changing anything. Data settles arguments that opinions only prolong.
Rebuild it
Automate what is repeatable, error-proof what is not, and leave people the work that needs judgment.
Trajectory
From the shop floor to the corner office.
2026 — Present
SMS Medical
Chief Operating Officer
A family-owned clinical diagnostics company serving patients, providers and healthcare partners. I lead operations, growth and strategic partnerships.
- Run day-to-day lab operations: mobile phlebotomy, accessioning, in-house testing, send-outs and billing.
- Automated nightly order intake from facility records into the lab system, with draw rules that prevent duplicate and unnecessary draws.
- Built an AI agent network that reads the fax and email inbox, extracts requisitions and drafts orders for human approval.
- Built real-time dispatch and chain-of-custody tracking for urgent draws.
- Expanded the in-house test menu and audited critical-value safety settings across the lab system.
- Planned the fit-out of a new laboratory, including a dedicated PCR room.
2018 — 2026
Entegris
Engineering Manager, Production and Product Development
CMP polishing pads for semiconductor fabs. Eight years and three roles: senior engineer, lead engineer, then manager of production and product development engineering.
- Cut grooving and pad diameter cutting time on the CNCs, saving $350,000 a year.
- Raised capacity 30% with no new equipment by converting plunge blades to saw blades and speeding up grooving cycles.
- Pioneered a lamination process that runs 50% faster and has since been adopted at other sites.
- Introduced a one-pass pad cleaning tool that removed a bottleneck and saves $150,000 a year.
- Added a dual-beam white light sensor to the lamination sheeter: 8% fewer mis-cuts and $150,000 saved a year.
- Led the site business continuity plan to 100% readiness across departments.
- Hired and mentored engineers; a co-op's capacity model is now part of site-wide planning.
2015 — 2018
Ford Motor Company
Process Engineer
Body shop dimensional quality in Chicago. I led a cross-shift team of nine layout inspectors and chased variation to its root cause.
- Worked with suppliers on incoming defects: defect rates down 15% and material waste down 10%.
- Put in a vision system to measure critical points, feeding process adjustments that reduced variation.
- Solved a liftgate closing-effort problem with a designed experiment that traced it to striker angle and a control module.
- Redesigned tooling to reduce dents and dings on body panels and raise process capability.
2013 — 2015
QMI Security Solutions
Design Engineer
Rolling shutters and security grilles. I designed extrusions, dies and the processes to build them.
- Made end caps modular: 30% less inventory and 15% lower cost.
- Designed and tested a shutter system that runs on solar power.
- Designed a stretch-forming die and stronger aluminum extrusions.
- Took a new side-folding grille from design through layout, training and production.
2012 — 2013
Midwest Manufacturing
Automation Engineer
Controls for production lines.
- Built and modified HMIs in WinCC, Wonderware and FactoryTalk.
- Programmed PLCs in RSLogix 5000, RSLogix 500 and DirectSoft.
2011 — 2012
GPM Inc. and Charter Films
Engineering Intern
Two internships alongside a full course load.
- Designed an enclosed washer booth for submersible pumps up to 20 feet long.
- Modeled the layout for a manufacturing line expansion and wrote standard operating procedures.
- Analyzed live machine data to predict maintenance and reviewed sustainability practices.
A laboratory rebuilt as an assembly line for answers.
As COO I mapped every handoff between a doctor’s order and a delivered result, then automated the ones that did not need a person.
Order intake on autopilot
Every evening the system pulls facility order reports, parses them, applies draw rules, creates the orders and emails each phlebotomist a print-ready route for the morning.
AI that reads the fax inbox
An agent network classifies every inbound fax and email, lifts patient, provider and tests off the page with document vision, and drafts the order for a person to approve.
Urgent draw dispatch
An urgent order texts the phlebotomy team, the first reply claims it, and every handoff from draw to courier to lab is tracked. No patient data leaves the system.
Send-outs by barcode
Scan a specimen and the reference lab requisition fills itself in and prints. No retyping, no transcription errors.
Finance portal
One secure dashboard for the whole revenue cycle: payers, aging, eligibility, reimbursement gaps and medical-necessity risk.
Quality by audit
Nine new assays planned and verified on the chemistry analyzer, and every critical-value rule in the lab system checked for gaps.
From the idea to the day it ships.
The projects that moved the numbers most, each broken down the way I run them: what I saw, how we built it and what it delivered.
SMS Medical · Chief Operating Officer
Hands-free order intake
orders retyped by hand
Vision
Every lab order already existed in a facility's record system. Nobody should have to type it a second time, and no resident should be drawn twice for the same test.
Execution
A nightly pipeline signs in to the facility record system, pulls the order reports, parses them and maps each test to the lab's panels. Draw-cadence and duplicate rules decide what is really due. Orders are created in the lab system, phlebotomy tasks are routed, and an evening audit reconciles everything.
Delivery
Each phlebotomist gets a print-ready route by email the night before. The run repeats six nights a week across every client facility, with a retry button when a source system misbehaves.
Where the method was learned.
Two engineering degrees meant a lot of projects. These are the ones that still shape how I work: model it, test it, then decide.
Facility Planning and Simulation · Team of three, 2010
Unblocking a production cell
less time in the system
Problem
A cell making three riflescope mounting systems was choking. Parts spent over three hours in a system that should take minutes, and nobody could say which station was to blame.
Method
We cleaned the processing-time log, fitted statistical distributions to arrivals and process times, and built as-is and to-be models in ProModel. The model put the bottleneck at ring machining, running at 99.9% utilisation.
Result
Adding capacity at four stations took daily throughput from 530 to 2,535 units and time in system from 193 minutes to under 11. Work in process fell from 1,016 to 92.
A few more, in pictures.
Two disciplines. One way of working.
B.S. Mechanical Engineering
University of Minnesota Duluth
2012 · Cum laude with distinction
B.S. Industrial Engineering
University of Minnesota Duluth
2012 · Cum laude · President, Industrial Engineering Club
Six Sigma Black Belt
Ford Motor Company
Define, Measure, Analyze, Improve, Control
Mini-MBA, Executive Education
Quinlan School of Business, Loyola University Chicago
2019
Tau Beta Pi
Engineering Honor Society
Vice President, 2011 to 2012
Let’s build something better.
Open to conversations about operations, automation and building teams that run well.